Refinery Development

Refinery Construction

Project Information

  • Client: Gulf Refining Co.
  • Location: Ras Tanura, Saudi Arabia
  • Date: March 8, 2021
  • Category: Downstream, Refining
  • Duration: 14 Months
  • Tags: EPC, Turnkey, Petrochemicals

Refinery Expansion & Modernization

We managed the expansion and upgrade of an existing refinery to increase capacity by 250,000 barrels/day. This included modernization of crude distillation units, new hydrocracking systems, and emissions-reducing equipment.

The entire project was delivered under an EPC contract, meeting tight regulatory and performance benchmarks with minimal downtime.

The Challenge

Working in a live refinery required strict coordination to avoid production disruption. The integration of new units with legacy systems also presented compatibility and scheduling challenges.

  • Live site expansion with limited shutdown windows
  • Complex integration with existing systems
  • Stringent HSE and emissions targets

Our Solution

Our phased construction strategy allowed uninterrupted operations. We used digital twins and smart commissioning tools for precise handovers and conducted simulations for all critical transitions.

  • Phased execution with live monitoring
  • Advanced system integration and testing
  • Compliance with ISO and environmental standards